
Add to Cart
Brief Introduction of Filtering Material& Function for Water Treatment Unit
Stage | Description | Component Item No. | Replace time | Function |
1st | 5um pp Spun Fiber | PP-10” | 2-3months | Remove the particles,dust,mud etc. |
2nd | Granular Carbon Filter | GAC-10”(UDF-10) | 4-6month | Remove the chlorine,organics,odor,smell turbidity etc. |
3rd | Block Carbon Filter | CTO-10” | 4-6months | Remove the chlorine,odor,smell and suspending particles. |
4th | RO membrane | CSM or FCS or FILMTEC | 1-2yesrs | Remove the bacteria,heavy metal,salt,bad mineral substance and other dissolved matter and chemical drug in the running water |
5th | Post inline Carbon Filter | T-33 | 1year | Adjust the taste. |
6th | UFmembrane | UF-10 | 1-2years | Concentrates particles,collolds and separates them from raw water. |
7 TH | Uv light | 6W | 1-2years | Kill bacteria viruses,mocro-organisms in water |
Product Characteristic
²It adopts membrane with American space technology, and applies the advanced international technique of reverse osmosis(RO)membranceto produce pure water.
²5 stages filtration, eliminates the sediment, suspended solid, colloid, organic compounds, heavy metal, soluble solid, bacteria, virus, pyrogenetic bacterium and other harmful substances in the original water, retains only water molecule and dissolved oxygen.
²It adopts famous import mute and high pressure pump, with long service life and reliable quality.
²Interchangeable pretreatment filter, effectively guarantees the pretreatment effect; easy interchange, economical filter-core price, with low cost to produce water.
²With the function of high pressure flash reverse osmosis membrane, effectively extends the service life of RO membrane.
²Automatic control of water-producing process (the machine will shutdown when the original water lacks or the water tank is full of water)
convenient drainage | Fconvenient place for installing water and electricity |
Fplace that avoids the Sun from direct shinning | Fdry place with environment temperature 5~40°C |
Fclean place that is free from insects or rats | Fplace around which is free from flammable, explodable goods and electrical equipment |
Fplace around which is free from sundries stacking, not easy to collide, but easy to install |
Requirement for Installation Place
PURE WATER TANK COLLTED
Note:diffrent model tank ,the price also diffrent
QC TEAM
A QC team with more than 20 professional and technical personnel. To ensure 100% products checking.
Material: Strictly control of material using, meet international requested standards.
Semi-finished products inspection: Product inspection before 100% finished. Such as Visual Inspection, Leak Testing, Comprehensive Safty Test and so on.
Production line test: With work team or data engineer who will inspect machines and lines at fixed period.
Finished Product Inspection: Quality and property test before products are packed and loaded.